
Add to Cart
PRODUCT DESCRIPTION
ZB 200 Bridge is the ’hot product’ of the TONGKAI modular steel bridge system. The ZB 200 Bridge is the ideal solution for rapid, durable and worthy for permanent or temporary bridging, humanitarian aid and disaster relief operation, replacement of damaged bridge, and provides the flexibility to bridge designers and contractors.
The ZB 200 Bridge uses standardized components, or super panel and a selection of decking systems to create a versatile heavy-duty modular steel bridge system with a clear spanning capability of up to 60.96 m (200 ft). The ZB 200 Bridge system combines strong and durable structure with high speed of construction to provide significant advantages over more traditional bridge construction techniques even in the limited access locations such as rural area or disaster stricken area.
APPLICATION
Technical Specification
Span | 9.144m(30ft ) upto 60.96m(200ft) |
Road Width | single lane 3.15m/4.2m ; double lane 7.35m |
Material Grade | S460J0,S355JR,GR65,GR50 |
Load Capacity | HL-93,HS25-44, HA ,HA+20HB |
Surface Finish | Painted or Galvanized |
Joint System | Pin and Bolt System |
Erection Method | Crane lifting , Cantilever Launching Method |