Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. Innovation seeks development and Cooperation wins the future.

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Bailey Bridge /

ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span

Contact Now
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Visit Website
City:zhenjiang
Province/State:jiangsu
Country/Region:china
Contact Person:MrAndy
Contact Now

ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span

Ask Latest Price
Video Channel
Brand Name :Tongkai
Model Number :ZB200/TK200/Compact 200
Certification :ISO,EN1090,SGS ,CIDB
Place of Origin :China
MOQ :1 set
Price :1500USD ~2000USD/ton
Payment Terms :L/C, T/T, Western Union, MoneyGram
Supply Ability :3000/month
Delivery Time :15~45days
Packaging Details :Nude and Steel case
Material :S460J0,S355JR,S355J0,Gr65,Gr50
Load :HA ,HB,HA+20HB,AASHTO HL-93,HS35-44
Lane :Single lane 3.15m~4.2m,Double Lane 7.35m, three lane 10.5m
Surface Finish :Pained or Galvanized
Deck :Anti skid aggerate
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

PRODUCT DESCRIPTION

ZB 200 Bridge is the ’hot product’ of the TONGKAI modular steel bridge system. The ZB 200 Bridge is the ideal solution for rapid, durable and worthy for permanent or temporary bridging, humanitarian aid and disaster relief operation, replacement of damaged bridge, and provides the flexibility to bridge designers and contractors.

ZB 200 Bridge uses standardized components, or super panel and a selection of decking systems to create a versatile heavy-duty modular steel bridge system with a clear spanning capability of up to 60.96 m (200 ft). The ZB 200 Bridge system combines strong and durable structure with high speed of construction to provide significant advantages over more traditional bridge construction techniques even in the limited access locations such as rural area or disaster stricken area.

APPLICATION

  • Permanent or semi-permanent bridging
  • Long term temporary bridging
  • Rural infrastructure project
  • Urban traffic project
  • Humanitarian aid and disaster relief operation
  • Pedestrian bridging
  • Services pipelines
  • Construction site access
  • Replacement of damaged bridge
  • Emergency response stock

Features

  • Modular
  • Rapid-build
  • Can be assembled using light plant
  • Can be crane built or cantilever launched
  • Relocatable
  • Transport in standard containers
  • Long span capability
  • Single and multi-span solutions available
  • Robust
  • High fatigue capability
  • Heavy axle / Wheel load capacity
  • Long life with minimal maintenance
  • Optional ramps, footwalks, piers, parapets and barriers
  • Various deck options available

Technical Specification

Span

9.144m upto 60.96m

Road Width

single lane 3.15m/4.2m ; double lane 7.35m

Material Grade S460J0,S355JR,GR65,GR50
Load Capacity HL-93,HS25-44, HA ,HA+20HB
Surface Finish Painted or Galvanized
Joint System Pin and Bolt System
Erection Method

Crane lifting , Cantilever Launching Method

ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span

Inquiry Cart 0