Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. Innovation seeks development and Cooperation wins the future.

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Bailey Bridge /

Bailey Bridge Construction Platform Temporary Steel Bridge

Contact Now
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Visit Website
City:zhenjiang
Province/State:jiangsu
Country/Region:china
Contact Person:MrAndy
Contact Now

Bailey Bridge Construction Platform Temporary Steel Bridge

Ask Latest Price
Video Channel
Brand Name :Tongkai
Model Number :TK100
Certification :ISO9001, EN1090,ISO3834
Place of Origin :China
MOQ :1set
Price :FOB1000USD
Payment Terms :L/C, T/T, Western Union, MoneyGram
Supply Ability :500T/M
Delivery Time :15days
Packaging Details :Nude Packing ,Steel case
Material :S460J0,S355JR,S235JR
Single Span :9~36m
Net Width :4m~20m
Load :50T ~250T
Color :Green, Grey, Orange,Red
Application :Construction
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Bailey Bridge Deck Type Bridge Compact 100 Large wide Construction Platform Temporary

Brief Introduction

Deck-type panel bridges are normally two lanes, class 50 or higher bridges assembled to replace single-lane bridges. A deck-type panel bridge has the following advantages over a through-type bridge :

  • Roadway can be wider for passage of extra-wide vehicles.
  • Deck-type assembly allows greater side overhang of vehicles.
  • A lighter decking system can be used when the roadway is supported by trusses.
  • With some sloping banks, the span between abutments is shorter than in a through-type bridge, because bearings are set 5 feet (1.5 meters) below road level.
  • Demolished piers need not be built Up to the level of the roadway.
  • There are no overhead restrictions.

A deck-type panel bridge has the following disadvantages:

  • Excavation at abutments may be necessary because bearings are 5 feet (1.5 meters) below the roadway.
  • It is more difficult to launch.
  • It must be lowered 5 feet (1.5 meters) onto the bearings.
  • Waterway clearance is decreased.

APPLICATION

  • Temporary bridging
  • Rural infrastructure project
  • Construction Platform
  • Heavy load
  • Wide Width required

Bailey Bridge Construction Platform Temporary Steel Bridge

Inquiry Cart 0